File #: 140700    Version: 1 Name: Modification of Design-Build Requirements - Airport’s Terminal 1 Center Renovation and the Boarding Area B Reconstruction Projects
Type: Ordinance Status: Passed
Introduced: 6/24/2014 In control: Clerk of the Board
On agenda: 6/24/2014 Final action: 8/7/2014
Enactment date: 8/7/2014 Enactment #: 183-14
Title: Ordinance modifying or waiving certain required contracting procedures in the Administrative Code, as applied to the design-build of two Airport projects in the Terminal 1 Program (the Terminal 1 Center Renovation and the Boarding Area B Reconstruction Projects).
Attachments: 1. Leg Ver1, 2. Leg Dig Ver1, 3. Comm Pkt 071414, 4. Board Pkt 072214, 5. Board Pkt 072914, 6. Leg Final
Legislation Details
 *NOTE: These reports are produced in HTML format and are accessible to screen readers.