File #: 990219    Version: 1 Name: Caltrain Right of Way
Type: Resolution Status: Passed
Introduced: 2/8/1999 In control: Board of Supervisors
On agenda: 2/17/1999 Final action: 2/26/1999
Enactment date: Enactment #: 124-99
Title: Resolution urging the Peninsula Corridor Joint Powers Board to design any improvements or alterations to the Caltrain right-of-way so as to retain the ability to add or maintain express tracks necessary to provide flexible, frequent and reliable service of local, express, intercity and high speed trains and to allow for the most economical adoption of extra tracks in the future.
Sponsors: Tom Ammiano, Sue Bierman, Leslie Katz, Mark Leno
Attachments: 1. Leg_Final
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
2/26/19991 Mayor APPROVED  Action details Meeting details Not available
2/17/19991 Board of Supervisors ADOPTEDPass Action details Meeting details Not available
2/8/19991 President REFERRED FOR ADOPTION WITHOUT COMMITTEE REFERENCE AGENDA AT THE NEXT BOARD MEETING  Action details Meeting details Not available
Legislation Details
 *NOTE: These reports are produced in HTML format and are accessible to screen readers.