File #: 240142    Version: 1 Name: Hearing - U.S. Army Corps of Engineers SF Waterfront Draft Plan
Type: Hearing Status: Filed
Introduced: 2/13/2024 In control: Clerk of the Board
On agenda: Final action: 3/25/2024
Enactment date: Enactment #:
Title: Hearing to receive an informational presentation on the United States (U.S.) Army Corps of Engineers San Francisco (SF) Waterfront Coastal Flood Study Draft Integrated Feasibility Report and Environmental Impact Statement; and requesting the Port, Planning Department, and Army Corps of Engineers to report.
Sponsors: Aaron Peskin
Attachments: 1. Referral FYI 022124, 2. Waterfront Flood Study Rpt 021324, 3. Comm Pkt 032524, 4. Comment Ltr, 5. Port Presentation 032524
Legislation Details
 *NOTE: These reports are produced in HTML format and are accessible to screen readers.