logo City Hall
1 Dr. Carlton B. Goodlett 
Place 
San Francisco, CA  94102-
4689
City and County of San Francisco Legislation Details File #:  Version: 2 120362 Name: Street Encroachments - Van Ness Avenue, Cedar 
Street, and Geary Boulevard - California Pacific 
Medical Center: Cathedral Hill Campus
Status: Type: Resolution Passed File created: In control: 6/4/2013 Board of Supervisors On agenda: Final action: 7/3/2013 Enactment date: 7/3/2013 221-13 Enactment #: Title: Resolution granting revocable permission to the California Pacific Medical Center to occupy a portion  of the public right of way on Van Ness Avenue, in order to construct and maintain a pedestrian tunnel  under Van Ness Avenue (State Highway 101), to connect the new medical office building and the new  hospital located at 1100 and 1101 Van Ness Avenue, respectively; to construct and maintain off-site  improvements on the north side of Cedar Street, between Van Ness Avenue and Polk Street, across  the street from the medical office building and on the south side of Cedar Street contiguous to the  property at 1001 Polk Street (Assessor’s Block No. 0694, Lot No. 004), including reconstructing and  widening the existing sidewalk, installing new landscaping and reconstructing the existing roadway  with pavers; and to install and maintain two 30,000 gallon diesel fuel tanks within the public right of  way under Geary Boulevard, between Franklin Street and Van Ness Avenue, in order to serve the  hospital at 1101 Van Ness Avenue; and making environmental findings, and findings of consistency  with the General Plan and the priority policies of Planning Code, Section 101.1. Sponsors: Mayor, David Chiu, Mark Farrell, David Campos Attachments: 1. Leg_Ver1, 2. Comm_Pkt_061512, 3. Comm_Pkt_062512, 4. Comm_Pkt_070912, 5. 
Comm_Pkt_071612, 6. Leg_Ver2, 7. ARS_App_032911, 8. DPW_Order_180262, 9. Drawing_Q-20-
699, 10. Maps, 11. MTA_Res_12-064, 12. Response_PLN_052413, 13. PC_Motion_18883, 14. 
PC_Motion_18891, 15. Response_DOT_042512, 16. Str_Encroach_Agmt, 17. 
TASC_Minutes_022312, 18. Hrg_Notice_061713, 19. DPW_Ltr_051513, 20. Comm_Pkt_061713, 21. 
Board_Packet_062513, 22. Legislation_Final
Action By Date Action Result Ver. ASSIGNED UNDER 30 DAY RULE President 4/10/2012 1 CONTINUED Land Use and Economic 
Development Committee
6/15/2012 1 Pass CONTINUED Land Use and Economic 
Development Committee
6/25/2012 1 Pass CONTINUED Land Use and Economic 
Development Committee
7/9/2012 1 Pass CONTINUED TO CALL OF THE CHAIR Land Use and Economic 
Development Committee
7/16/2012 1 Pass SUBSTITUTED AND ASSIGNED President 6/4/2013 1 REFERRED WITHOUT 
RECOMMENDATION
Land Use and Economic 
Development Committee
6/17/2013 2 Pass ADOPTED Board of Supervisors 6/25/2013 2 Pass APPROVED Mayor 7/3/2013 2