File #: 220706    Version: 1 Name: Potrero HOPE SF Project, Phase 1 - Accepting Portions of 25th Street and Connecticut Street
Type: Ordinance Status: Passed
Introduced: 6/7/2022 In control: Clerk of the Board
On agenda: Final action: 7/28/2022
Enactment date: 7/28/2022 Enactment #: 168-22
Title: Ordinance accepting an irrevocable offer of public improvements associated with Potrero HOPE SF Project, Phase 1, including portions of 25th Street and Connecticut Street (“Phase 1 Public Infrastructure”); dedicating the Phase 1 Public Infrastructure to public use; designating such public infrastructure for street and roadway purposes; establishing official public right-of-way widths and street grades; amending Ordinance No. 1061 entitled “Regulating the Width of Sidewalks” to establish official sidewalk width on the abovementioned street areas; accepting the Phase 1 Public Infrastructure for City maintenance and liability purposes, subject to specified limitations; adopting findings under the California Environmental Quality Act; making findings of consistency with the General Plan, and the eight priority policies of Planning Code, Section 101.1; accepting a Public Works Order recommending various actions in regard to the public infrastructure improvements; and authorizing official acts, as defined herein, in connection with this Ordinance.
Sponsors: Mayor, Shamann Walton, Ahsha Safai
Attachments: 1. Leg Ver1, 2. Leg Dig Ver1, 3. PW Order No. 206650, 4. Offer of Improvements, 5. Utility Bill of Sale 042222, 6. Street Improv Permit, 7. Drawing No. Q-20-1182 060722, 8. Drawing No. Q-20-1181 060722, 9. PC Motion No. 19529 121015, 10. PC Motion No. 19530 121015, 11. PLN Gen Plan Ref Verification 060622, 12. PW Notice of Completion 052721, 13. PW Memo 060722, 14. Recorded Doc No. 2022062235, 15. Comm Pkt 071122, 16. Board Pkt 071922, 17. Board Pkt 072622, 18. Leg Final
Related files: 161308, 220707
Legislation Details
 *NOTE: These reports are produced in HTML format and are accessible to screen readers.