Share to Facebook Share to Twitter Bookmark and Share
File #: 201151    Version: 1 Name: Environment, Public Works Codes - Construction and Demolition Debris Recovery
Type: Ordinance Status: 30 Day Rule
Introduced: 10/6/2020 In control: Land Use and Transportation Committee
On agenda: Final action:
Enactment date: Enactment #:
Title: Ordinance amending the Environment Code and the Public Works Code to require transporters of construction and demolition debris to obtain a temporary or annual permit from the Department of Environment for each vehicle and debris box used for such transport and to comply with permit conditions; to require facilities that process such debris to register with the Department of Environment and comply with updated registration conditions; to require each person who conducts full demolition projects as permitted by the Department of Building Inspection to submit to the Director of the Department of Environment a material reduction and recovery plan providing for at least 75% recovery away from landfill, and to verify this recovery rate after completing the project; to authorize the Director to impose administrative penalties for violations; and affirming the Planning Department’s determination under the California Environmental Quality Act.
Sponsors: Ahsha Safai, Shamann Walton
Attachments: 1. Leg Ver1, 2. Leg Dig Ver1, 3. Referral CEQA 101320, 4. Referral FYI 101320, 5. CEQA Determination 101620
Legislation Details
 *NOTE: These reports are produced in HTML format and are accessible to screen readers.